Note: This calculator provides estimates for project cycle time and throughput based on your input parameters. Actual results may vary depending on team dynamics, complexity, and external factors.

Estimated Results

Estimated Cycle Time:

days

Estimated Throughput:

story points/day

Total Project Duration:

days

Advanced Parameters

Results Visualization

How Does This Calculator Work?

The Cycle Time & Throughput Estimator uses industry standard formulas and adjustments based on team and project characteristics to provide estimates for your project planning needs.

Parameter Description Impact on Calculations
Project Size Total size of the project measured in story points Directly affects total duration - larger projects require more time
Team Size Number of team members working on the project More team members generally increase throughput, but with diminishing returns
Team Experience Overall experience level of the team Higher experience levels lead to higher productivity and shorter cycle times
Working Hours Effective working hours per day Directly impacts daily throughput capacity
Productivity Percentage of time spent on productive work Adjusts throughput calculations to account for meetings, breaks, etc.
Project Methodology The project management approach being used Different methodologies have different efficiency factors based on research
Project Complexity Level of project complexity Higher complexity increases cycle time and reduces throughput
External Dependencies Level of dependency on external factors/teams More dependencies introduce additional wait times and coordination overhead
WIP Limit Maximum number of work items in progress at once Lower WIP limits can improve flow efficiency but may cap throughput

Calculation Methodology:

  • Base throughput is calculated from team size, productivity, and experience level
  • Cycle time is calculated based on the complexity, methodology, and WIP limits
  • Various adjustment factors are applied based on dependencies and methodology
  • Project duration is calculated by dividing project size by daily throughput
  • Results are adjusted for real-world conditions using industry standard factors

Note on Accuracy: While this calculator uses established formulas and industry benchmarks from 2025, actual project performance can vary. Use these estimates as a starting point for planning discussions, not as definitive forecasts.